Do It Yourself projects
We've selected our builder! I'm also tweaking the size of the original overflow, I need something to handle max 6000gph. The tank should be installed in December if my schedule and the builder's works out. I'm working too much to make November a possiblity. I need to take some days off for the builder because of the fact that the tank needs to be built on site. I'll take some photos tonight of the tank room, its been progressing. The leg tank is installed, and they layout has been ...
...