View RSS Feed

Recent Blogs Posts

  1. The Manifold Assembly: Running multiple items from a single pump

    With the return section completed, it was time to build the second section that is called a manifold. It has its own pump, and feeds a few items. The beauty of a manifold is that one external pump takes the place of multiple submersible pumps, and a series of valves provides the user to control flow rates to each item.

    My goal was to run three reactors and a frag tank, and also have it available as a secondary back up to the main return pump if needed. I wanted to run the manifold ...
    Categories
    Plumbing
  2. The plan for Plumbing a 120 with two 20's

    I have been thinking about the plumbing for a while and decide to use sketchup to get it down on paper. My goal is to have the setup to be as clean as possible. After seen glassreef build I wanted to do a clean build but under the stand(s). After much reading I plan on using the herbie overflow system. The two 1 inch holes will be used as the main drain and the two ¾ inch holes will be the emergency. The Main drain will be tied together into 1.5 inch pvc and a gate valve will be used to control ...
    Tags: herbie, manifold
    Categories
    Tank Entry , ‎ Plumbing